Remodeling · sized by weight and volume
Remodeling Dumpster Rental for Kitchens and Baths
Remodels mix bulky cabinets with heavy tile. Size by room, then check the weight of what comes out.
Book by 3 PM for next-day delivery · Deliveries 7 AM–5 PM
- Local hauler, our own trucks
- Scale ticket with every bill
- Boards protect your driveway
7daysincluded
- Your costFlat rate with 7 days and 2–6 tons. Over that, $75/ton by the pound.
- DeliveryBook by 3 PM for next-day, 7 AM–5 PM, across DFW.
- Which sizeOne full bathroom: 10-yard.
- PlacementDriveway, on wooden boards, near where you load.
- Not allowedChemicals, wet paint, batteries. Mattresses, tires, Freon items $50 each.
Talk to the team that drives the truck. Deliveries 7 AM–5 PM · Book by 3 PM for next-day delivery.
Call for a remodeling dumpster (945) 313-7111What size dumpster do you need for remodeling?
For remodeling work, the table matches the job to a size. One full bathroom usually fits a 10-yard. Every size includes 7 days and 2 to 6 tons, and weight over that is $75 per ton by the exact pound.
| Room | Typical size | Why |
|---|---|---|
| One full bathroom | 10-yard | Tile, tub, vanity, drywall |
| Two bathrooms or bath + flooring | 15-yard | Tile weight adds up |
| Kitchen, 200–300 sq ft | 20-yard | Cabinets, counters, drywall, flooring |
| Whole-floor remodel | 30-yard | Mostly bulky, lighter debris |
How much will your remodeling debris weigh?
Drywall averages about 467 lb per cubic yard (EPA). Ten cubic yards of drywall and cabinets is roughly 2.3 tons, inside a 20-yard's 3 tons. Ceramic tile and mortar beds are much heavier, so load tile low and keep the total in check.
Example final bill
Example only. The certified scale ticket is attached to your final invoice, emailed 3 to 5 business days after pickup.
Where should the dumpster go for remodeling work?
Put the bin close to the door the crew uses, on the driveway. A remodel often runs past 7 days; extra days are $25 each.
For remodeling jobs, as on every delivery, our drivers set the bin on wooden boards to protect concrete and asphalt. A $125 trip fee applies if the bin can't be placed because of cars, wires or locked gates. Placement guide.
Which rules apply to remodeling debris?
Homes built before 1978 fall under the EPA Renovation, Repair and Painting Rule (40 CFR 745) when paid contractors disturb painted surfaces. Old flooring and ceiling texture can contain asbestos; test before demolition.
General information, not legal advice. Confirm with your city, HOA or permit office.
What if the job runs long or the bin fills early?
If demo fills the bin before the finish work starts, a swap is a new flat-rate rental. If you only need more time, keep it for $25 per day.
What can't go in?
Not allowed in the dumpster
- Hazardous chemicals
- Wet paint
- Batteries
Take these to a household hazardous waste drop-off. Full list and where items go.
Allowed for $50 per item
- Mattresses
- Tires
- Fridges, freezers and AC units (Freon)
These need special handling at the disposal site, so tell us when you book.
Remodeling dumpster questions
What size dumpster for a kitchen remodel?
Most kitchens of 200 to 300 square feet fit a 20-yard, which includes 3 tons.
How long should I rent a dumpster for a remodel?
Every rental includes 7 days. Longer remodels add $25 per extra day, which is often cheaper than a second rental.
Can old cabinets and countertops go in?
Cabinets, countertops, drywall and flooring all go in. Granite and stone counters are heavy, so count them in your weight estimate.
Can I throw out the old fridge?
Fridges with Freon are accepted for $50 each, since refrigerant must be recovered before disposal under 40 CFR 82.155.
Schedule your remodeling dumpster
Deliveries 7 AM–5 PM · Book by 3 PM for next-day delivery. We confirm the size before the truck leaves the yard.